005 - Single Home - Full Basement Renovation -Kanata, ON - ONGOING 2025
Overview
This basement renovation in Kanata transformed an underutilized lower level into a modern, multifunctional living space built for comfort, entertainment, and everyday luxury. Guided by a detailed 3D design, the project moved seamlessly from permitting to finishing, featuring soundproofing, custom flooring, and elegant fixtures throughout. With standout features like a sleek electric fireplace and a fully equipped wet bar, this basement now offers the warmth and sophistication of a main-floor retreat—crafted to support both relaxed living and refined hosting.
What makes this project unique?
The renovation was guided by a professionally rendered 3D layout, ensuring efficient construction sequencing and cohesive design throughout.
01
3D-Driven Planning
The renovation was guided by a professionally rendered 3D layout, ensuring efficient construction sequencing and cohesive design throughout.
02
High-End Finishes
Premium materials such as click-vinyl flooring, modern tile, LED mirrors, and sleek quartz surfaces give the space a polished, upscale look.
03
Custom Lifestyle Features
A built-in electric fireplace and bespoke wet bar add both comfort and entertainment value, transforming the basement into a hub for relaxation and hosting.
04
Soundproofed for Comfort
Enhanced insulation and soundproofing make this space ideal for both quiet retreats and lively gatherings—without disrupting the rest of the home.
Enhanced insulation and soundproofing make this space ideal for both quiet retreats and lively gatherings—without disrupting the rest of the home.
PROJECT - 005
By
THE TGi GROUP ( Dhiego P. Lopes )
5 min read ·
Published on Jan 12, 2025
Basement Renovation (FINAL PICTURES YET TO BE TAKEN)
This Kanata home renovation began with a professionally rendered 3D layout, setting the foundation for a well-planned and precisely executed transformation. Construction started immediately after permit approval, beginning with framing, HVAC, rough-in plumbing, and electrical work. ESA inspections were completed early, followed by soundproof insulation and full drywall installation, including mudding and priming of all walls and ceilings. Once city inspections for framing, plumbing, and HVAC passed, the project moved into the finishing stages—covering electrical completions and material selections for tile, click-vinyl flooring, paint colours, shower glass frame, baseboard type, and door layout.
Finishes & Flooring
With the core structure and systems in place, flooring was installed throughout, including premium click-vinyl and tile. This stage also included final ESA inspection and back framing for hardware such as handles and door stoppers.
Carpentry & Paint
Final carpentry brought the space together with baseboard installation, door fittings, and full interior painting. Touch-ups were completed with precision to ensure a flawless finish throughout the basement.
Fixtures & Final Details
Key installations included the shower glass, toilet, vanity, LED mirror, shower fixtures, reducers, and access panels. Old carpeting was removed, and a complete clean-up was performed in preparation for the final inspection.
Lifestyle Features
Signature features like a sleek electric fireplace and custom wet bar elevate the space with warmth, style, and function—adding the perfect finishing touches to this fully reimagined lower level.
Click-vinyl and tile flooring were installed, and final electrical work—including lighting and ESA sign-off—was completed.
August 2025
Fixtures, Paint & Final Inspection
Carpentry, painting, hardware installation, and all final fixtures—including vanity, shower glass, and fireplace—were completed before the final clean-up and inspection.