007 - Single Home - Full Basement Renovation - Barrhaven, ON - COMPLETED 2025

Overview

This Barrhaven basement renovation was a ground-up transformation, turning a raw lower level into a beautifully finished, multifunctional living space. Guided by a 3D-rendered layout, the project was executed with precision—from framing and infrastructure to high-end finishes and lifestyle-focused amenities. Every stage was thoughtfully managed to deliver a space that feels less like a basement and more like a luxury extension of the main home.

What makes this project unique?

The renovation was executed based on a tailored 3D design, allowing every finish and functional element to be pre-visualized and precisely implemented.
01
Custom 3D Layout
The renovation was executed based on a tailored 3D design, allowing every finish and functional element to be pre-visualized and precisely implemented.
02
Wellness Integration
A built-in sauna, steam shower, and glass-enclosed gym turn this basement into a personalized wellness retreat.
03
Entertainment Experience
The raised-platform home theatre and wet/dry bar combination make this space ideal for immersive movie nights or stylish hosting.
04
Cohesive Design Detailing
From click-vinyl flooring to custom cabinetry and a hand-selected paint palette, every element was chosen to complement the overall design vision.
From click-vinyl flooring to custom cabinetry and a hand-selected paint palette, every element was chosen to complement the overall design vision.

PROJECT - 007

By

THE TGi GROUP ( Dhiego P. Lopes )

6 min read ·
Published on Jul 22, 2023

Basement Renovation

This Barrhaven basement renovation was built from a professionally rendered 3D design, providing a clear vision for layout, finishes, and flow. Once permits were approved, construction began with framing, HVAC installation, and rough-ins for plumbing and electrical. ESA inspections were completed early, followed by soundproof insulation and full drywall installation with mudding and priming across all walls and ceilings. After passing city inspections for framing, HVAC, and plumbing, the project transitioned into finish planning—covering final electricals, material selections for tile, click-vinyl flooring, custom baseboards, shower glass framing, paint colours, and door layouts.

Finishes & Flooring

With structural elements complete, click-vinyl flooring was installed throughout the main living areas for durability and visual warmth, while tile was used in the bathroom and wet areas. Final ESA approval was received, and back framing was completed with hardware like door stops, reducers, and access panels.

Carpentry & Paint

Custom carpentry brought the basement to life with hardwood stairs, a handcrafted railing, doors, and custom cabinetry. Every surface—walls, baseboards, and trim—was coated in a carefully chosen custom paint palette, enhancing the unity and upscale feel of the space.

Fixtures & Final Details

Final touches included installing the shower glass, toilet, vanity, LED mirror, and brushed fixtures in the bathroom. All remaining hardware was completed, old carpeting was removed, and the entire space was cleaned in preparation for the final inspection.

Lifestyle Features

This renovation was designed with luxury in mind, featuring a raised-platform home theatre, wet and dry bars with custom cabinets, a glass-enclosed gym, and a dedicated sauna and steam shower—all seamlessly integrated into a spacious and functional layout that elevates everyday living in Barrhaven.

Construction Timeline

Late April 2025

Permits & Rough-Ins

Following permit approval, the team completed framing, HVAC installation, plumbing and electrical rough-ins, and initial ESA inspections.

May 2025

Drywall & Insulation

Soundproof insulation was installed, followed by drywall hanging, mudding, and priming of all basement walls and ceilings.

Late May 2025

Flooring & Carpentry

Click-vinyl flooring and tile were installed, and custom carpentry—including hardwood stairs and railing—brought structure to the space.

June 2025

Fixtures & Final Inspection

Bathroom fixtures, cabinetry, mirrors, and hardware were installed, followed by final painting, full cleanup, and a successful final inspection.

Ready to start your NExt Project?

Contact us!

SHOWROOM HOURS

MONDAY - FRIDAY

9:00AM to 5:00PM

SATURDAY

9:00AM to 4:00PM

SUNDAY

Appointment Only

Thank you! We'll be reaching out to you shortly!
Oops! Something went wrong. Please try again.