Renovations

006 - Single Home - Full Basement Renovation - Barrhaven, ON - COMPLETED 2025

Overview

This Barrhaven basement renovation is a standout example of turning unused space into a luxurious, lifestyle-driven extension of the home. Beginning with a detailed 3D design, the project was built from the ground up—integrating custom carpentry, premium finishes, and tailored amenities for entertainment, wellness, and everyday comfort. The result is a fully finished basement that feels like a second main floor—thoughtfully crafted for both function and indulgence.

What makes this project unique?

The basement entry was completely opened up and finished with a flush-mount hardwood stair railing, creating a seamless visual transition between floors.
01
Open Stair Concept with Custom Railing
The basement entry was completely opened up and finished with a flush-mount hardwood stair railing, creating a seamless visual transition between floors.
02
Built-In Wellness Zone
A dedicated gym, steam shower, and sauna were integrated into the layout, bringing spa-level relaxation into the home.
03
Entertainment-Focused Design
A raised platform home theatre and dual-function wet and dry bar create the perfect setup for entertaining guests or relaxing with family.
04
High-End Material Selection
The use of hardwood flooring, glass partitions, LED mirrors, and custom cabinetry throughout elevates the entire space with cohesive, upscale finishes.
The use of hardwood flooring, glass partitions, LED mirrors, and custom cabinetry throughout elevates the entire space with cohesive, upscale finishes.

PROJECT - 006

By

THE TGi GROUP ( Dhiego P. Lopes )

3 min read ·
Published on Feb 09, 2025

Basement Renovation

This Barrhaven basement renovation began with a detailed 3D-rendered design, setting the foundation for a well-organized and expertly executed transformation. Once permits were approved, construction moved quickly into framing, HVAC installation, and rough-ins for plumbing and electrical. Early ESA inspections ensured compliance, followed by the installation of soundproof insulation and full drywall application, including mudding and priming of all walls and ceilings. After successful city inspections for framing, HVAC, and plumbing, the focus shifted to finishing details—ranging from final electrical work to material selections for tile, hardwood flooring, paint colours, glass wall framing, custom railing design, and trim profiles.

Finishes & Flooring

With the structural work complete, hardwood floors were installed across the main living spaces, along with tile in wet areas and click-vinyl where appropriate. This stage also included final ESA approval and back framing elements like door stops, hardware, and access panels.

Carpentry & Paint

Custom carpentry gave the basement its final shape, including hardwood stairs, doors, baseboards, and a bespoke flush-mount stair railing inspired by open staircase concepts. The entire basement was painted with a carefully selected palette, followed by detailed touch-ups to ensure a polished, high-end finish.

Fixtures & Final Details

Final installations included the shower glass, steam shower fixtures, toilets, vanities, LED mirrors, reducers, and all remaining bathroom hardware. Old carpeting was removed, and the space underwent a full professional clean-up in preparation for final inspection.

Lifestyle Features

This basement is packed with luxury elements including a fully equipped home theatre with a raised platform, a glass-enclosed gym, a wet bar and dry bar with custom cabinetry, and a dedicated sauna and steam shower—delivering a true at-home retreat designed for wellness, entertainment, and elevated everyday living.

Basement Renovation Process

Construction Timeline

March 2025

Permits & Structural Work

Construction kicked off following permit approval, with framing, HVAC, and rough-ins for plumbing and electrical completed alongside ESA inspection.

April 2025

Drywall & Insulation

Soundproof insulation was installed throughout, followed by drywall application, mudding, and full priming of all basement walls and ceilings.

Late May 2025

Flooring, Carpentry & ESA Final

Hardwood, tile, and vinyl floors were installed, along with custom stair railings and final ESA sign-off for electrical finishing.

May 2025

Fixtures, Final Touches & Inspection

Shower glass, LED mirrors, vanities, and gym glass walls were installed, followed by paint, hardware, full cleanup, and final inspection to complete the renovation.

Ready to start your NExt Project?

Contact us!

SHOWROOM HOURS

MONDAY - FRIDAY

9:00AM to 5:00PM

SATURDAY

9:00AM to 4:00PM

SUNDAY

Appointment Only

Thank you! We'll be reaching out to you shortly!
Oops! Something went wrong. Please try again.