Renovations

008 - Single Home - Full Basement Renovation -Barrhaven, ON - ONGOING, COMPLETES AUGUST 2025

Overview

This Barrhaven basement renovation transformed an unfinished lower level into a thoughtfully designed and fully functional living space—blending clean aesthetics with smart planning. Guided by a detailed 3D layout, the project moved quickly from permit approval to completion, including soundproofed walls, open stair design, and carefully selected finishes. Every element—from the flooring to the fixtures—was chosen to create a warm, modern, and livable environment, while bonus storage features and entertainment spaces elevated the overall usability of the home.

What makes this project unique?

The decision to remove walls around the staircase allows for a brighter, more open layout that makes the basement feel larger and more connected to the main floor.
01
Open Staircase Design
The decision to remove walls around the staircase allows for a brighter, more open layout that makes the basement feel larger and more connected to the main floor.
02
Dedicated TV Feature Wall
A framed-out wall was built specifically for media and entertainment, creating a natural focal point in the living area.
03
Stylish Wet Bar Installation
The wet bar features dark cabinetry and a marble-inspired countertop, bringing functionality and visual contrast to the basement's soft tones.
04
Custom Garage Storage
Built-in shelving was added to the finished section of the garage, offering clean, organized storage that’s both practical and discreet.
Built-in shelving was added to the finished section of the garage, offering clean, organized storage that’s both practical and discreet.

PROJECT - 008

By

THE TGi GROUP ( Dhiego P. Lopes )

7 min read ·
Published on Aug 30, 2023

Basement Renovation

This Barrhaven basement renovation began with a professionally rendered 3D layout and moved swiftly into construction following permit approval. The project progressed through structural framing, HVAC installation, rough-ins for plumbing and electrical, and initial ESA inspections. With soundproof insulation installed and city inspections passed for framing, HVAC, and plumbing, the team advanced to drywall installation, mudding, and full priming of all walls and ceilings. The final design was brought to life through careful material selections, including tile finishes, click-vinyl flooring, door layouts, baseboard profiles, and a cohesive paint palette.

Finishes & Flooring

The main living areas were finished with durable click-vinyl flooring to create warmth and continuity, while the bathroom was tiled with marble-look porcelain for a bright, elegant touch. A dedicated TV wall was framed out in the living space, and open stairs were built to visually expand the basement footprint.

Carpentry & Paint

Custom carpentry work included baseboards, interior doors, and detailed trim throughout the space. The wet bar cabinetry features dark wood tones and a stone-look countertop, adding both function and contrast to the soft neutral palette used on the walls and ceilings.

Fixtures & Final Details

Final elements included the installation of a wall-mounted LED mirror, a modern vanity, a toilet, and a spacious glass-enclosed shower with a built-in bench. Back framing for hardware, reducers, access panels, and a full professional cleanup were completed before the final inspection.

Lifestyle Features

This renovation includes a bright living area with TV wall, a modern wet bar, a sleek bathroom with walk-in shower and bench, a private bedroom, and an open stair design that enhances the flow and openness of the space. Additionally, a custom shelving unit was built in the finished section of the garage, offering practical storage with a clean finish.

Construction Timeline

April 2025

Permits & Framing

Construction began after permit approval with framing, HVAC, and rough-ins for plumbing and electrical, followed by ESA inspection.

May 2025

Drywall & Insulation

Soundproof insulation was installed and followed by drywall hanging, mudding, and full priming of walls and ceilings.

Late May 2025

Flooring & Carpentry

Click-vinyl flooring and tile were installed, along with custom carpentry for baseboards, doors, the TV wall, and wet bar cabinetry.

June 2025

Fixtures & Final Inspection

Final installations included the shower glass, vanity, toilet, LED mirror, and garage shelving, followed by full cleanup and successful inspection.

Ready to start your NExt Project?

Contact us!

SHOWROOM HOURS

MONDAY - FRIDAY

9:00AM to 5:00PM

SATURDAY

9:00AM to 4:00PM

SUNDAY

Appointment Only

Thank you! We'll be reaching out to you shortly!
Oops! Something went wrong. Please try again.