Real Estate

013 - Missing Middle - Multi-Family - 10-Plex - Full Development and Construction - Westboro Area. Ottawa, ON - CONSTRUCTION STARTS SPRING 2026

Overview

The old brick home that once stood quietly on this Nepean lot is about to make way for a bold new chapter in the area’s housing story. Starting April 2026, TGi Real Estate Developments will break ground on a 5-storey, 10-unit boutique residence designed for those who value modern style, smart layouts, and central convenience. Completion is expected in August 2026, introducing a striking addition to the local skyline and a premium living experience for its residents.

What makes this project unique?

Only 10 residences in the entire building, ensuring privacy and community.
01
Exclusive Living
Only 10 residences in the entire building, ensuring privacy and community.
02
Architectural Elegance
A modern façade with clean lines, balanced proportions, and premium exterior finishes.
03
Smart Interior Design
One-bedroom and bachelor layouts that maximize comfort and efficiency.
04
Prime Location
Steps from parks, schools, transit, and essential neighbourhood amenities.
Steps from parks, schools, transit, and essential neighbourhood amenities.

PROJECT - 013

By

Roldan P. Guerrero

9 min read ·
Published on

In the heart of Nepean, change is on the horizon. What was once a quiet, timeworn brick home, pictured in the first image, will soon be replaced by a bold and modern residential statement. Beginning in April 2026, TGi Real Estate Developments will transform this property into a 5-storey, 10-unit boutique building—a project that blends architectural elegance, smart space planning, and exclusive living.

The image below reveals the vision: a sleek, contemporary façade with a balanced mix of white and dark tones, floor-to-ceiling windows, and a central entryway framed in clean, minimal lines. This design is more than visual appeal—it’s a promise of refined urban living.

This isn’t a high-density tower; it’s an intimate residence with just 10 exclusive units, offering privacy and community in equal measure. Every home is designed with both style and functionality in mind, from efficient bachelor layouts to spacious one-bedroom suites. Shared spaces—including a secure entry, elevator access, and bright hallways—are finished to a premium standard, making the entire building feel cohesive and welcoming.

By August 2026, the transformation from the first image to the second will be complete. The once modest lot will house a modern landmark in Nepean—a residence that reflects TGi Real Estate Developments’ dedication to lasting value, prime comfort, and refined design.

Construction Timeline

April 2026

Demolition & Site Prep

Removal of the existing home and preparation of the lot for construction.

May 2026

Structural Framing

Construction of the building’s main framework, walls, and roof.

June 2026

Interior Systems & Finishes

Installation of plumbing, electrical systems, insulation, and first-stage interior finishes.

August 2026

Final Completion & Occupancy

Finishing touches, inspections, and resident move-ins begin.

Ready to start your NExt Project?

Contact us!

SHOWROOM HOURS

MONDAY - FRIDAY

9:00AM to 5:00PM

SATURDAY

9:00AM to 4:00PM

SUNDAY

Appointment Only

Thank you! We'll be reaching out to you shortly!
Oops! Something went wrong. Please try again.